General Contractor · Northern California

Built plumb.Built once.

Commercial construction across the Bay Area since 1971. Priced with precision, sequenced without drama, and handed over on the day we said we would.

Established

1971

Projects

1,240+

EMR

0.58

On time

98.4%

55

Years building

Since 1971

1,240+

Projects delivered

Across 9 counties

38M

Square feet

Ground-up and renovation

0.58

EMR safety rating

Industry avg. 1.00

Who we are

Great buildings
start with people
who give a damn.

Plumbline has been employee-owned since 1994. The people estimating your project are the same people standing on the slab when it pours, and they carry the outcome personally.

Plumbline crew on site
Fig. 01Foundry Row — Level 2 Coordination Walk
01

We price it before we promise it.

Preconstruction isn't a formality — it's where the budget is actually won. Our teams estimate against real subcontractor pricing, not square-foot averages.

02

The superintendent never changes.

Whoever walks your site on day one walks it on the last day. Continuity in the field is the single biggest predictor of a clean closeout.

03

Nothing gets buried quietly.

Field conditions, cost exposure, schedule slip — you hear it from us the day we find it, with options attached. Bad news doesn't improve with age.

PreconstructionDesign–BuildVirtual DesignPrefabricationSelf-Perform ConcreteSeismic RetrofitTenant ImprovementGround-Up

Expertise

How a
building
goes up.

Five stages, each one closing out risk before the next begins. Nothing moves forward on optimism.

Preconstruction

Cost variance target: under 3%

We price the drawings before they're finished. Constructability review, long-lead procurement and a cost plan you can actually hold us to.

Design–Build

Single-source accountability

One contract covering design and construction. Fewer seams to argue about, and a single team carrying the schedule from concept to occupancy.

Virtual Design

BIM LOD 400 coordination

Every trade modelled and clash-detected before a single beam is fabricated. The expensive surprises get found on a screen, not in the field.

Prefabrication

Up to 40% faster installation

Bathroom pods, MEP racks and exterior panels assembled indoors under controlled conditions, then installed once, correctly, on site.

Build & Close

98.4% on-time completion

Daily field reporting, a live schedule you can see, and a closeout package delivered before the last punch item is signed.

Start a project

Bring us the
hard one.

Send us the drawings, the site constraints, and the date it has to open. We will tell you what it costs and whether we believe the schedule — before you sign anything.

General enquiries

Mon–Fri, 7am–5pm PT

Licensing

CSLB #482911

Bonded & insured